Quality Control

Quality gates, not slogans

Checks are built into the project workflow

Requirements, drawings and acceptance criteria are reviewed before manufacturing starts. Inspection points then follow the tool through machining, fitting, mold trial, sample verification and release. The exact inspection plan and report package are agreed for each project.

  1. 01

    Requirement review

    Confirm revision, resin, tolerance, appearance, assembly, test needs and approval criteria.

  2. 02

    Material and machining control

    Check incoming tool steel documents and inspect critical inserts, electrodes and machined features.

  3. 03

    Assembly and pre-trial check

    Review fitting, movement, cooling connections, safety items and trial readiness.

  4. 04

    Trial and sample verification

    Record process conditions, sample observations and dimensional findings against agreed criteria.

  5. 05

    Correction and release

    Track open issues, verify corrective actions and compile the agreed release documents.

Tec-Shine quality inspection laboratory with coordinate measuring equipment
Dimensional inspection in the Tec-Shine quality laboratory.
Coordinate measurement of a mold component
Critical dimensions checked against the approved drawing.

Verified certification

ISO 9001:2015

Certificate F04326Q00353R502, valid from 10 April 2026 to 29 March 2029.

Certified scopeProduction and sales of Plastic Mould and Metal Mould.

The certified scope does not include injection-molding production. It is shown here exactly to avoid overstating coverage.

View ISO 9001 certificate
Tec-Shine ISO 9001:2015 certificate preview
Current certificate preview. Use the PDF link for full details.

Project evidence

Documents available by project scope

Tell us which customer or industry format is required at quotation stage. The final package is defined against the confirmed project scope.

  • DFM findings and drawing-review notes
  • Material and heat-treatment certificates
  • Critical-dimension or CMM inspection records
  • Mold-trial records with sample findings
  • Corrective-action and revision tracking
  • Mold book and agreed release files

Define the quality plan before quotation

Share the drawing, resin, key dimensions, appearance standard and required reports. Free initial DFM feedback is provided within 48 hours.

Start Free DFM Review

Ready to review a mold project?

Share CAD files, material, volume and timing. Tec-Shine will review manufacturability and quotation direction.

Start Free DFM Review